Why your void loss figure disagrees with itself
Three teams, three definitions, one board pack. How we get an organisation to agree a metric without convening a six-month committee.
On this page
A finance director once showed us three void loss figures for the same quarter, produced by three teams in the same organisation, and asked which one was right. The honest answer was all of them, which is not what he wanted to hear.
The numbers were £1.9m, £2.4m and £3.1m. Nobody had made an arithmetic error. Each team had answered a slightly different question, and none of them had written down which question they were answering.
What the three definitions actually were
It took two days of reading SQL and asking people to talk us through their spreadsheets to reconstruct the definitions. Once written side by side, the disagreement stopped being mysterious.
| Team | Clock starts | Major works voids | Basis | Q figure |
|---|---|---|---|---|
| Finance | Tenancy end date | Included | Calendar days × weekly rent / 7 | £3.1m |
| Housing operations | Keys returned | Excluded | Rent-days lost from the rent account | £2.4m |
| Asset management | Released to lettings | Excluded, tracked separately | Calendar days, capped at 90 | £1.9m |
Every one of those choices is defensible. Finance wants the full economic cost, including the flat that sat empty for fourteen months waiting for a roof. Operations wants a number their team can influence, and a void cannot be let while scaffolding is up. Asset management caps at 90 days because beyond that the property is a capital project, not a letting problem.
The trouble is that the board pack contained one of these three numbers, and which one depended on who compiled it that quarter.
Why telling everyone to just pick one fails
The instinct is to call a meeting and choose. We have watched that fail more than once, for a reason that becomes obvious in hindsight: each team is measured on its own figure. Asking operations to adopt the finance definition is asking them to accept a performance number that includes fourteen months of scaffolding they did not order.
So the meeting either ends without a decision, or ends with a decision that quietly gets ignored because the old query is still in someone’s spreadsheet and still feeds their own report.
A definition nobody is willing to be judged against will not survive the first quarter it makes someone look bad.
What we do instead
We stop trying to produce one number and start producing one lineage. The board gets a single headline figure, and every other figure in the organisation is derived from the same base table by applying explicit, named filters.
- Build one row per void period at the lowest useful grain: property, start event, end event, every candidate date stamp, rent basis, works flag.
- Define the filters as named, documented rules rather than as separate queries:
void_gross,void_lettable,void_lettable_capped_90. - Publish all three in the same table, next to each other, every month.
- Let the board pack use the gross figure, and let operations keep being measured on the lettable one.
- Make every dashboard state which rule it used, in the title, not in a footnote.
The argument about which number is right does not disappear, but it changes character. It becomes an argument about which rule suits which decision, held in front of a table where both rules are visible. That is a conversation people can finish.
The part that takes the longest
Not the modelling. The event dates. In the organisation above, tenancy end date was reliable because it drove rent accounting. Keys-returned was entered by hand by housing officers and missing on about 18% of records. Released-to-lettings lived in a separate system introduced in 2019, so anything earlier had to be inferred.
We spent three weeks on date reconstruction and two days on the metric logic. That ratio is normal. If someone quotes you a fortnight for a metric definition project, they have not looked at your date fields yet.
How to tell whether you have this problem
- Two reports in the same organisation give different values for the same period and nobody can explain the gap in under a minute.
- The explanation you do get includes the phrase “it depends how you count” without going on to say how.
- A metric definition exists in a governance document, but the query behind the board figure was written by someone who has left.
- Changing the definition would move someone’s performance number, everyone knows it, and nobody says it.
The last one is the real signal. Metric disputes that persist for years are rarely technical.
What we would do differently
On this engagement we published the three rules before finishing the date reconstruction, because the client wanted something in the next board pack. The first month’s figures moved when we improved the date inference, which cost us credibility we then had to earn back.
Now we hold publication until the quality flags are stable, and we show the board the flag counts from day one. A figure that moves in month two is worse than a figure that arrives in month two.
Retention rules that a housing officer can follow
A deletion policy nobody understands is a deletion policy nobody applies. Writing rules for the people who have to obey them.
4 min read · 3 June 2026Stock condition models fail at the survey, not the algorithm
If a third of your survey records predate the last refurbishment, no amount of gradient boosting rescues the forecast. What to fix first, and how to prove it.
4 min read · 29 July 2026Recognise any of this?